COMPLETED
Bolivia
AIM: Entire population of San Rafael has a drinking water supply in their homes. ACTIVITIES AND IMPACT: After 7 months of project execution, 2,900 meters of distribution network have been extended and 58 home connections have been made. During the 2 months after the completion of the project, San Rafael households (670) have 24 hours of drinking water per day. Cutting off water due to deficiencies of the water distribution system does not exceed 24 hours a month.
At the end of the project, the water access point of 670 households – 4,133 people (2,125 women) – is less than 500 meters away.
670
4133
5000
41,569.00 €
Asociación para la Erradicación de la Pobreza (APEP)
01/11/2016
31/05/2017
Goverment of Castilla y León
Public sector
34,636.00 €
ID 87